Diseño Construcción y Supervisión

Projects

Selected Projects

 

We’ve been able to build long-lasting relationships with our clients based on trust, hard work and transparency.

 

Majestic Hotels

Bavaro, Dominican Republic

MAJESTIC MIRAGE

Duration: 13 months, between 2015-2016

Role: General contractors managing civil works, including road infrastructure, electrical, sanitation and climatization.

Scale: 88 thousand m2 in civil works that include: a Lobby, seven hospitality buildings, animation building, beach structure, pools, solarium, access roads and internal connectivity, entrance structure, industrial building, access bridge and staff buildings.

MAJESTIC ELEGANCE

Duration: 12 months, 2007-2008

Role: General contractor for 65% of Civil Works, road, electric, sanitation and HVAC systems.

Scale: 60,000 m2 of construction, including: Lobby, 7 buildings, entertainment building, beach structure, pools, solarium,access routes, entryway, industrial warehouse, access bridge and staff building.

MAJESTIC COLONIAL

Duración:12 months, 2017

Rol: General contractors managing civil works and finishes.

Scale: Remodel of the convention center, entertainment building, lobby and hospitality buildings.

Client: Batle Group, Santiago Batle

"We can attest to the professional integrity, the excellent quality of the work carried out, as well as the compliance with the times and costs of the civil works. In these fifteen years, the relationship with Constructora AE has been very profitable for our company."

-SANTIAGO BATLE, TYCHE GROUP






Hotel Courtyard by Marriott

santo domingo, República Dominicana

Duration: 24 months, between 2021-2023

Role: General Contractor managing civil works.

Scale: 17-story building, 160 keys, lobby, restaurant, 6 levels of parking and a rooftop pool and bar in the 17th floor.

Client: Grupo Poma and its hospitality company, Real Hotel & Resorts.


Club Med Hotel Playa Esmeralda

Miches, Dominican Republic

Duration: 15 months, between 2018-2019.

Role: General contractors managing civil works. Executed in partnership with Constructora Aybar as Consorcio Aybar Espaillat.

Scale: 20,000 m2 in civil works including: 156 Explorer Cove hotel rooms with pool, bar and bathrooms, the main Lobby pool, Fitness Center, Beach Lounge, sports area buildings, Nautical Hut, Yoga Palapa, explorer home and children’s recreation area Kid’s Club, as well as the industrial storage buildings and underground sewage systems.

Client: Club Med. Alain Ibanes, Director of Construction and Tech Services, Club Med North America, Caribbean & Mexico and Sergio Escarfullery, Principal Architect with Escarfullery & Associates.

“The Espaillat engineers enjoy our appreciation and esteem, we recognize in them the qualities of two full-fledged engineering professionals. They have stood out for their constant presence at the project site, for their efficient way of coordinating the work, for their leadership and willingness to collaborate with the other parties involved, and for their ability to overcome obstacles that regularly arise in this type of project due to its remote location and difficult access, all of which has had a positive impact on the quality of the finished product and on meeting the times of delivery. It is worth noting their full cooperation and support to the property’s last minute works requests, which is very important and makes the difference between a chaotic and an orderly opening. "

—ALAIN IBANES, CLUB MED NORTE AMERICA, CARibbean & MÉXICO. 


GOLF RESIDENCE BUILDINGS

GOLF RESIDENCE BUILDINGS

Punta Blanca Golf and Beach Resort

Bavaro, Dominican Republic

Duration: 2006 to present

Role: General contractors managing civil works, roadways, electrical, sanitation and climatization.

Scale: 15,000 m2 in civil works including road infrastructure, Beach Club, Golf Club, apartment buildings on Extremadura Road, 4 apartment buildings Golf Residences , 9 villas, children’s recreation area, maintenance industrial buildings, and the sports club with a including semi-olympic pool, tennis courts, paddle court and indoor soccer.

Client: Dominico Catalan Group, Teodoro Garcia.

“The commercial relationship with Constructora AE, has been very gainful for our company in the past 16 years. Eng. Espaillat enjoys our appreciation and esteem, we recognize in him the qualities of a full-fledged engineering professional and his company has been able to deliver excellent quality civil and MEP works, complying with the times and agreed costs."

— TEODORO GARCÍA GIMENEZ, GRUPO DOMINICO CATALÁN S.A.

Villas Punta Blanca Golf and Beach Club

Duration: 3 villas in 2006 and 6 villas in 2014-2015.

Role: General contractors managing civil works, electrical, sanitation and climatization.

Scale: 9 villas. Villa Larimar, Villa Topacio, Villa Esmeralda,Villa Ámbar.

Interior Designer: Sandra Ehlert

Client: Dominico Catalan Group, Teodoro Garcia.


Amanera Hotel

PLAYA GRANDE, DR

Duration: 2015-2016 

Role: Financial Supervision of the project. Revision and approval of progress reports submitted by contractors for loan disbursement purposes.

Client: BHD León Bank


tropicalia-miches.jpeg

Hotel in Tropicalia Project

miches, DR

Duration: 2015-2020 

Role: Local Engineering Consultants to the international firm Walter P. Moore and Associates, Inc. with the goal of adapting the structural design to local regulations and assisting with government approvals and permitting.

Client: Walter P. Moore and Associates, Inc.


Casa Del Lago in Guavaberry Golf and Country Club

Juan Dolio, DR

Duration: 2009-2010

Role: General contractor for Civil Works road, electric, sanitation and HVAC systems.

Scale: This hospitality and residential project is located in Guavaberry Golf & Country Club. 1,800 m2 of construction, including: three apartment buildings with 27 apartment units each, two pools and social amenities, parking lot, and landscaping.

Client: Renaissance Partners LLC, Bob Moody.


Hotel Grand Bahia Principe Nueva Romana (Hotel Santana)

san pedro de macoris, DR

Duration: 12 months, 1999.

Role: General contractor for Civil Works, road, electric, sanitation and HVAC systems.

Scale: 40,000 m2 of construction, including: 25 villas of 16 rooms each, access roads, a Dominican town, Lobby building, entertainment building, restaurant, offices, laundry, tennis courts, pools, gym and beach club.

Client: Evenia Hotels, Jose Maria Molist.

websiteae-14.jpg

“Our 8-year long commercial relationship with Constructora AE has been very fruitful for our company. Constructora AE has executed for us a total of 40,000 m2 in civil works.”

— ORIOL MOLIST, EVENIA HOTELS. 


don uan.jpeg

Hotel Don Juan

boca chica, DR

Duration: 1996

Role: General contractor of civil works, sanitation, and electrical.

Scale: Building “El Coral” with 4 levels and 52 bedrooms, including the main hotel kitchen and the beach restaurant.

Client: Vicini Group

IMG-7519.jpg

Hotel Capella

Juan Dolio, DR

Duration: 1994

Role: General contractor of civil works

Scale: 28,000 m2 of construction including: 282 hotel rooms, Lobby, 2 pools, restaurants, gym, administrative offices, tennis courts and parks.

Client: Grupo Reid & Pellerano

1 (1).jpg

Executive Residences Metro

Juan Dolio, DR

Duration: 1993

Role: General contractor for civil works, sanitation, and electrical.

Scale: 7-story executive residential tower Metro Hotel, with 56 hotel rooms, commercial spaces and storage units

Client: Grupo Metro


websiteae-3.jpg

Casa De Campo Villa

la romana, DR

Duration: 1995

Role: General contractor

Scale: 600 sqm vacation residence including: 4 bedrooms, a recreation room, kitchen and service area, living areas, a pool and a jacuzzi.

Client: Private Residence

websiteae-7.jpg

Casinos Tranchant Group

eastern region, DR

Duration: 2001-2002

Role: General contractor

Scale: Three casinos, including: Hotel Santana Casino, Hotel Royal Casino and Hotel Las Caobas Casino.

Client: Tranchant Group

2020-08-18.jpeg

Manuel Arsenio Ureña Building

santo domingo, DR

Duration: 1991

Role: General contractor

Scale: 6-story building destined for the administrative offices and storage for the company.

Client: MAU, C. x A.


Screen Shot 2021-04-19 at 6.40.13 PM.png

Ros Building

santo domingo, DR

Duration: 1995

Role: General contractor

Scale: Construction of the 3rd level expansion of Ros Insurance and Consulting offices building in Santo Domingo’s Avenida Winston Churchill (recent photo).

Client: Grupo Ros

cuatro-periodicos-elogian-innovacion-de-listin-diario.jpeg

Listin Diario

santo domingo, DR

Duration: 1988-2000

Role: General contractor

Scale: 5,000 sqm of construction, including the extension of the administrative offices, redaction areas, storage, press, as well as for the construction of the paper storage offices in Los Alcarrizos.

Client: Listin Diario

websiteae-10.jpg

Banco Mercantil

santo domingo, DR

Duration: 1993-2003

Role: Construction Supervisor

Scale: Main offices in Santo Domingo and their new branches throughout the country.

Client: Banco Mercantil